July 10, 2008. The exterior steps
from the ground level to sanctuary
level are completed as are most
of the interior walls. The exterior
brick work and the second level
paneling is done. The inside still
has work to do, but given the pace
July 14, 2008. When construction
workers start to clean up, you
know you're getting close to the
end. The interior walls are
finished, ready for paint. The tan
panels for the exterior top half are
nearly complete, as is the brick
work in front. On the second floor
the risers for the sanctuary are in.
July 21, 2008. The top third of the
building is covered with panels
with a smooth concrete-like
material. The elevator is installed!
The rooms are getting clean. The
walls are done. The ceiling braces
are installed
July 30, 2008. The locks are on the
doors! The electricians are inside!
The elevator is on! The lights are
on! It looks like the exterior is
about 99.44% done. Cleanup and
painting appear to be next.
August 11, 2008. The end is near.
Inside the new fellowship hall has a
new floor and ceil. It's a very large
space.